• Delete
  • Edit

About

Marsyangdi Hydropower Station is a point of interest, located at Prithvi Highway, Aanbu Khaireni 33912, Nepal

Location :
Prithvi Highway, Aanbu Khaireni 33912

Added by Jopie, at 21 September 2015

Opening Hours

  • Monday 10:30 AM – 4:30 PM
  • Tuesday 10:30 AM – 4:30 PM
  • Wednesday 10:30 AM – 4:30 PM
  • Thursday 10:30 AM – 4:30 PM
  • Friday 10:30 AM – 4:30 PM
  • Saturday Closed
  • Sunday 10:30 AM – 4:30 PM

Gallery

Add missing information

Add email
Add phone
Add business description
Add website
Add Social Media
Add Products and Services

6 Reviews

  • Bivek Khatiwada
    24 January 2018

    Marsyangdi Hydropower Station is a peaking run-of-river power station with installed capacity of 69 MW with three units of 23 MW each and its annual design generation is 462.5 GWh. It is located at Aanbu Khaireni, Tanahun in the central region about 114 km west of Kathmandu on Prithivi Highway and lies on the right bank of Marsyangdi River. It was commissioned in 1989 AD and developed with the assistance from IDA, KFW, KFED, SFD, ADB and GON at a cost of USD 22 million.

    The generation from this power station contributed 10.67 % of the total energy to the INPS.

    response / report this review
  • KAMAL THAPA
    20 March 2017

    Upgrade and upgrade and upgrade please!

    response / report this review
  • Ekendra Lamsal
    24 September 2016

    Take no photos without permission of the guards.

    response / report this review
  • Sangeet Kayastha YP
    02 April 2016

    Not for tourists. Its hydro power

    response / report this review
  • Akhil Magar
    16 February 2016

    Second largest hydro power station 69megawat

    response / report this review
  • Abhaya Singh Pandey
    28 September 2015

    Second Largest Hydropower in nepal with installed capacity of 69 MW and annual design generation of 462.5 GWh.

    response / report this review

Rate & Write Reviews