• Delete
  • Edit

Shagaya CSP office

Kuwait

About

Shagaya CSP office is a point of interest, located at Kuwait

Location :
Kuwait

Added by Jopie, at 19 November 2016

Add missing information

Add email
Add phone
Add business description
Add website
Add Social Media
Add Products and Services

10 Reviews

  • Shaikh Zawed Ali
    31 May 2018

    Working with TSK (Solar Thermal Power Plant)

    response / report this review
  • Rajeswaran Sivasankar
    11 May 2018

    Kuwait’s first Concentrated Solar Power (CSP) plant with a capacity of 50 MW.

    Kuwait Shagaya 50MW solar Concentrated Solar Power project operates in 2018
    Shagaya 50MW CSP project, the first commercial CSP plant in Kuwait, is now under construction, and expected to be completed by the end of 2018. Developed by Kuwait Institute for Scientific Research (KISR), the project signed EPC contract (USD $385 million) with a consortium consisting of Spanish EPC company TSK and Kuwait’s Kharafi National in 2015.

    The 50MW CSP project is under the first phase of Shagaya Renewable Park, which was initiated and designed for demonstrating availability of reaching clean energy goal in Kuwait.

    Shagaya Park is originally designed into 3 phases, and Phase One includes a 50MW solar CSP plant, a 10MW Solar PV plant and a 10 MW wind plant. The expected total capacity of CSP will be 1150 MW (750 MW Parabolic Trough, 400 MW Solar Tower), PV 700MW, and wind 150MW. This mixture of technologies is subject for review and further optimized to maximize the Park’s power production during annual summer peak demand.

    Cost and performance will be the key factors for Shagaya CSP project. As KISR points, Currently cost for CSP is not as competitive as Solar PV and Wind Energy, there are still uncertainties for the future CSP plan in the RE park. If price for solar tower technology could be reduced to less than $10 cents/kWh, the CSP projects would be more completive. A Good news is that, DEWA’s 200 MW solar tower project just received world record low price of $9.45 cents/kWh, which may indicate a positive future for CSP in MENA area.

    response / report this review
  • Hélio Ferreira
    19 January 2018

    Muito bom

    response / report this review
  • Ella Kandialla
    14 October 2017

    Nice experience

    response / report this review
  • Surya Babu
    10 October 2017

    Well

    response / report this review
  • Beriz Dam
    09 October 2017

    hola, sigan mejorando, que Kuwait,necesita grandes avances, ustedes pueden!!!!!

    response / report this review
  • Moises Barros
    29 September 2017

    Arena y mas arena

    response / report this review
  • ING_aaybar
    17 July 2017

    Planta termosolar Shagaya

    response / report this review
  • Chelladurai Ponnusamy
    05 July 2017

    Yes

    response / report this review
  • Syed Naveed Ali Shah
    26 November 2016

    Shagaya solar power plant

    response / report this review

Rate & Write Reviews